Question:Which of the following will change the order of existing blocks via XML? 

A reference name="parent.block.name"> <action method="unsetChild"><alias>child_block_alias</alias></action> <action method="insert"><blockName>child.block.name</blockName><siblingName>name_of_block</siblingName><after>1</after><alias>child_block_alias</alias></action> </reference> 

B reference name="parent.block.name"> <action method="insert"><blockName>child.block.name</blockName><siblingName>name_of_block</siblingName><after>1</after><alias>child_block_alias</alias></action> <action method="unsetChild"><alias>child_block_alias</alias></action> </reference> 

C reference name="child.block.name"> <action method="unsetParent"><alias>child_block_alias</alias></action> <action method="insert"><blockName>parent.block.name</blockName><siblingName>name_of_block</siblingName><after>1</after><alias>child_block_alias</alias></action> </reference> 

D It is not possible to edit the order of existing blocks. 

+ Answer
+ Report
Total Preview: 913

Copyright © 2026. Powered by Intellect Software Ltd